منابع 1. Dimitrakopoulos, R. and Ramazan, S., 2004. "Uncertainty based production scheduling in open pit mining". SME transactions, 316.## 2. Dimtrakopoulos, R., Martinez, L., Ramazan, S., 2007, “A maximum upside/minimum downside approach to the traditional optimization of open pit mine design”, Journal of Mining Science, 43(1), 73-82.## 3. Dimitrakopoulos, R, Farrelly, C. Godoy, M; 2002; “Moving forward from traditional optimization: grade uncertainty and risk effects in open-pit design”, Mining Technology, 111(1); 82-88.## 4. Burmeister, B. From resource to reality: A critical review of the achievements of new Austtralian gold mining projects during (1983-1987), Macquarie University (1998). ## 5. Ravenscroft, P., 1992,”Risk analysis for mine scheduling by conditional simulation”, Transactions of the Institution of Mining and Metallurgy. Section A. Mining Industry, 101.## 6. Osanloo. M, Gholamnejad.J, Karimi.B, 2008, “Long-term open pit mine production planning: a review of models and algorithms”, International Journal of Mining, Reclamation and Environment, 22(1) 3-35.## 7. Dowd, P.A, 1994,” Risk assessment in reserve estimation and open-pit planning”, in Transactions of the Institution of Mining and Metallurgy (Section A: Mining Industry), 103.## 8. Denby, B., and D. Schofield. 1995,"Inclusion of risk assessment in open-pit design and scheduling." International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts. Vol. 5. No. 32## 9. Dimitrakopoulos.R, 1998, “Conditional simulation algorithms for modelling orebody uncertainty in open pit optimisation”, International Journal of Surface Mining, Reclamation and Environment, 12(4) 173-179.## 10. Godoy, M., Dimitrakopoulos, R., 2004, “Managing risk and waste mining in long-term production scheduling of open-pit mines”, SME transactions, 316(3).## 11. Ramazan, S. Dimitrakopoulos, R, 2004, “Traditional and new MIP models for production scheduling with in-situ grade variability”, International Journal of Surface Mining, 18(2) 85-98.## 12. Whittle, D. Bozorgebrahimi, A, 2004, “Hybrid Pits: Linking Conditional Simulation and Lerchs-Grossman through Set Theory”, Orebody Modelling and Strategic Mine Planning, 14, 1-4.## 13. Leite, A. Dimitrakopoulos, R, 2007, “Stochastic optimisation model for open pit mine planning: application and risk analysis at copper deposit”, Mining Technology, 116(3), 109-118.## 14. Gholamnejad, J, Osanloo, M, 2007, ”Incorporation of ore grade uncertainty into the push back design process”, Journal of the South African Institute of Mining & Metallurgy, 107(3), 177.## 15. Goodfellow, R., Dimitrakopoulos, R, 2016, “Global optimization of open pit mining complexes with uncertainty”, Applied Soft Computing, 40(2), 292-304. ## 16. عطائی، محمد؛ حسینی،سیدمهدی؛ ۱۳۹۰؛ «طراحی محدوده و برنامهریزی تولید در معادن سطحی» انتشارات جهاد دانشگاهی امیرکبیر.## 17. صیادی، احمدرضا؛ فتحیانپور،نادر؛ موسوی، امین ا...؛ ۱۳۹۱؛ « کاربرد شبیهسازی گوسی متوالی شرطی در تعیین عدم قطعیت عیار بلوک های تخمینی در معدن فسفات اسفوردی» روشهای تحلیلی و عددی در مهندسی معدن، شماره ۳، ۴۴-۵۲.## 18. Menabde, M. Froyland, G., Stone, P., Yeates, G, 2004, “Mining schedule optimisation for conditionally simulated orebodies”. In Proceedings of the international symposium on orebody modelling and strategic mine Planning: uncertainty and risk management, pp. 347-352## 19. Dimitrakopoulos, R., 2011, “Stochastic optimization for strategic mine planning: a decade of developments”, Journal of Mining Science, 47(2) 138-150.## 20. Deutsch, C. Journel, A, 1992,” GSLIB Geostatistical Software Library and User’s Guide”, New York: Oxford Univ, in Press.## 21. مر، فرید ؛ ۱۳۹۳؛ «کاهش ریسک ناشی از عدم قطعیت عیاری در برنامهریزی بلندمدت معدن فسفات اسفوردی» پایاننامه کارشناسی ارشد، دانشگاه تربیت مدرس.## 22. حمداد فرامرزی، حسین؛ شکورشهابی،رضا ؛ ۱۳۹۷؛ «بررسی تاثیر فاکتورهای هندسی ذخایر بر پارامترهای مدلسازی نرمافزاری با تاکید بر کانسارهای رگهای» یافتههای نوین زمینشناسی کاربردی، شماره ۲۳، ص ۱۴۰-۱۵۲.##