مراجع
[1] Chitombo, G. P. 2010; “Cave mining: 16 years after Laubscher's 1994 paper 'Cave mining - state of the art”. Mining Technology, Vol. 119(3), 132-141. doi: 10.1179/174328610X12820409992255.
[2] Nezhadshahmohammad, F., Aghababaei, H., & Pourrahimian, Y. 2017; “Conditional draw control system in block-cave production scheduling using mathematical programming”, International Journal of Mining, Reclamation and Environment, 1-24. doi: 10.1080174780930,2017,1385155.
[3] Flores, G. 2014; “Future Challenges and Why Cave Mining Must Change”. Paper presented at the Caving Santiago, Chile.
[4] Rafiee, R., Ataei, M., Khalokakaie, R., Jalali, S., & Sereshki, F. 2015; “Determination and Assessment of Parameters Influencing Rock Mass Cavability in Block Caving Mines Using the Probabilistic Rock Engineering System”, Rock Mechanics and Rock Engineering, 48, doi: 10.1007/s00603-014-0614-9.
[5] Laubscher, D. H. 1994; “Cave mining-the state of the art”, The Journal of The South African Institute of Mining and Metallurgy, 273-299.
[6] Eduardo Rojas, R. M., and Patricio Cavieres. 2001; “Preundercut Caving in El Teniente Mine”, Chile Underground Mining Methods - Engineering Fundamentals and International Case Studies, 417-423.
[7] نژادشاه محمد، فرشاد؛ و فتحی، محمد باقر؛ «ارائه روشی برای کنترل راستای پیشروی استخراج تخریب بلوکی»، 1399، نشریه مهندسی منابع معدنی.
Doi: 10.30479/jmre.2020.12435.1369
[8] Rubio, E. 2014; “Block caving strategic mine planning using Risk-Return portfilio optimization”. Paper presented at the 3rd International Symposium on Block and Sublevel Caving (Caving 2014), Santiago-Chile.
[9] Zarate U., E., Pourrahimian, Y., & Boisvert, J. 2020; “Optimizing block caving drawpoints over multiple geostatistical models”, International Journal of Mining, Reclamation and Environment, Vol. 34(1), 55-74.
[10] Khodayari, F., & Pourrahimian, Y. 2019; “Long-term production scheduling optimization and 3D material mixing analysis for block caving mines”, Transactions of the Institution of Mining and Metallurgy, Section A: Mining Technology. doi: 10.1080/25726668.2018.1563742.
[11] Rahal, D. 2008; “Draw Control in Block Caving Using Mixed Integer Linear Programming”, (PhD ), The University of Queensland.
[12] Guest, A. R., Van Hout, G. J., & Von Johannides, A. 2000; “An Application of Linear Programming for Block Cave Draw Control”, Paper presented at the MassMin, Brisbane, Australin.
[13] Queyranne, M., Parkinson, A., McCormick, S. T., Diering, T., Malkin, P., & Wolsey, L. 2008; “The Drawpoint Scheduling Approach to Production Planning in a Block Cave Mine”, Workshop Operation Research in Mining, Viña del Mar, Chile., 318-357.
[14] Parkinson, A. 2012; “Essays on Sequence Optimization in Block Cave Mining and Inventory Policies with Two Delivery Sizes”, (PhD), The University Of British Columbia, The University Of British Columbia.
[15] Rahal, D., Smith, M., Van Hout, G., & Von Johannides, A. 2003; “The use of mixed integer linear programming for long-term scheduling in block caving mines”, Application of Computers and Operations Research ill the Minerals Industries, South African Institute of Mining and Metallurgy, 123-132.
[16] Rubio, E., Caceres, C., & Scoble, M. 2004; “Towards an integrated approach to block cave planning”, Paper presented at the Massmin, Santiago, Chile.
[17] Smoljanovic, M., Rubio, E., & Morales, N. 2001; “Panel Caving Scheduling Under Precedence Constraints Considering Mining System”, Paper presented at the 35th APCOM Symposium, Wollongong, NSW, Australia.
[18] Nezhadshahmohammad, F., Pourrahimian, Y., & Aghababaei, H. 2018; “
Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling”, International Journal of Mining Science and Technology, Vol. 6. 28, pp. 941-950,doi:
https://doi.org/10.1016/j.ijmst.2017.11.005.
[19] Caccetta, L. 2007; “Application of Optimisation Techniques in Open Pit Miningin”, in Handbook of Operations Research in Natural Resources. International Series in Operations Research amp; Springe, Vol. 99, pp. 547- 559.