Abdollahy, M Determination of optimal conditions in column flotation of Masoud Abad Lorestan
Talc Mine [Volume 7, Issue 14, 2012, Pages 91-97]
Abdollahy, M kinetics of Chemical leaching of Darehzar low grade copper ore [Volume 7, Issue 17, 2013, Pages 51-60]
Abdollhy, M The study of operation conditions on solvent extraction of gold in continuous process using laboratory scale mixer-settler [Volume 7, Issue 15, 2012, Pages 57-66]
Abolghasemi, H The study of operation conditions on solvent extraction of gold in continuous process using laboratory scale mixer-settler [Volume 7, Issue 15, 2012, Pages 57-66]
Afraei, S The study of effective factors on Hardy Cross method convergence in mine ventilation networks analysis [Volume 7, Issue 17, 2013, Pages 15-21]
Afzalaghaei, A.R Back Analysis of Siah Bisheh Dam Powerhouse Cavern Using
Instrumentation’s Results [Volume 7, Issue 14, 2012, Pages 83-90]
Ahmadi, M A New Method for Determination of Kaiser Effect from Rock Acoustic Emission Signals [Volume 7, Issue 17, 2013, Pages 61-72]
Alizadeh Sevari, B TBM Shield Selection Squeezing Ground, Case Study Part 2 Qomroud Tunel [Volume 7, Issue 17, 2013, Pages 93-106]
Allami, M Presentation of Empirical Relations for Determining Deformation Modulus in Rock Masses of Southwest of Iran [Volume 7, Issue 16, 2012, Pages 79-87]
Amini, M Measuring Permeability Coefficient of a Granular Soil against Acidic Solutions in Heap Leaching Structures [Volume 7, Issue 16, 2012, Pages 43-52]
Annabestani, M Design and Installation of a Particle Size Analyzer for Mineral Processing Plants [Volume 7, Issue 14, 2012, Pages 99-105]
Arabamiri, A.R Two and Three Dimensional Modeling of Electrical Tomography Data Applied for Studying Qanat and Subsurface Shallow Structures [Volume 7, Issue 17, 2013, Pages 107-112]
Asghari, O Simulation of mineral grades and decrease of conditional variance of simulation using hard and soft conditioning data, based on Local moment constraints method. [Volume 7, Issue 16, 2012, Pages 13-23]
Ataei, M Presentation of Statistical Models for Predicting the Ornamental Stone
Sawability [Volume 7, Issue 14, 2012, Pages 31-40]
Ataei, M Optimization of mine production rate using conditional NPV maximization [Volume 7, Issue 15, 2012, Pages 87-96]
Ataei, M Development of a Fuzzy Classification for Prediction of Penetration Rate of Drilling in Mines [Volume 7, Issue 16, 2012, Pages 89-99]
Ataei, M TBM Shield Selection Squeezing Ground, Case Study Part 2 Qomroud Tunel [Volume 7, Issue 17, 2013, Pages 93-106]
B
Basiri, M.H Valuation of Mining Development Projects by Real Options Approach [Volume 7, Issue 14, 2012, Pages 15-30]
Basiri, M.H Investigating the Effects of Time and Cost Uncertainties on The Feasibility Study Procedures in Mining Projects [Volume 7, Issue 16, 2012, Pages 101-114]
D
D, D Optimization of mine production rate using conditional NPV maximization [Volume 7, Issue 15, 2012, Pages 87-96]
Dehghani, A Evaluation of Alternative Methods for Estimation of Bond Work Index
(Case Study: Choghart Iron Ore) [Volume 7, Issue 14, 2012, Pages 63-68]
Dehghani, A Replacement of Dynamite with ANFO in Tunneling [Volume 7, Issue 17, 2013, Pages 1-14]
Doulati, F Determination of Residual Component of Gravitimetry Data Using Probability Plot Modeling Method [Volume 7, Issue 17, 2013, Pages 23-32]
E
Ebrahimi, M.A An Equation to predict ground surface settlement due to metro tunneling using EPB TBM [Volume 7, Issue 15, 2012, Pages 67-76]
Ebrahimi Farsangi, M.A An optimized grout mix design for EPB TBM tunneling of Shiraz metro in dry condition [Volume 7, Issue 14, 2012, Pages 69-82]
Emeri, X Simulation of mineral grades and decrease of conditional variance of simulation using hard and soft conditioning data, based on Local moment constraints method. [Volume 7, Issue 16, 2012, Pages 13-23]
Eshaqi, E Two and Three Dimensional Modeling of Electrical Tomography Data Applied for Studying Qanat and Subsurface Shallow Structures [Volume 7, Issue 17, 2013, Pages 107-112]
Esmaeili, K Investigation of Heavy metals Enrichment in Stream Sediments of Sungun Porphyry Copper Deposit [Volume 7, Issue 17, 2013, Pages 33-39]
Esmaeili, M.J Design and Installation of a Particle Size Analyzer for Mineral Processing Plants [Volume 7, Issue 14, 2012, Pages 99-105]
F
Fanipakdel, M.R Valuation of Mining Development Projects by Real Options Approach [Volume 7, Issue 14, 2012, Pages 15-30]
Farzanegan, A Discharge Grate Effect on Simulation of Ball Mills [Volume 7, Issue 16, 2012, Pages 33-41]
Fasihi, E Selection of Suitable Mechanized Machine for Tehran Metro Line7 Project (East – West Tunnel) [Volume 7, Issue 15, 2012, Pages 77-86]
Fathi, M.B Determination of optimal conditions in column flotation of Masoud Abad Lorestan
Talc Mine [Volume 7, Issue 14, 2012, Pages 91-97]
Foroutan, R Designing Dynamic Simulator of Grinding Circuit using SIMULINK [Volume 7, Issue 17, 2013, Pages 41-49]
G
Gharibi, Kh Chalcopyrite removal from copper-molybdenite concentrate
using electrochemical flotation and external potential [Volume 7, Issue 16, 2012, Pages 53-67]
Ghavami, R Application of the MARS modeling to estimate the gold values based on the paragenetic elements for an exploration data set [Volume 7, Issue 15, 2012, Pages 15-23]
Ghavami, R Determination of Residual Component of Gravitimetry Data Using Probability Plot Modeling Method [Volume 7, Issue 17, 2013, Pages 23-32]
Ghazvinian, A A New Method for Determination of Kaiser Effect from Rock Acoustic Emission Signals [Volume 7, Issue 17, 2013, Pages 61-72]
Ghoddousi, H Valuation of Mining Development Projects by Real Options Approach [Volume 7, Issue 14, 2012, Pages 15-30]
Goshtasbi, K Estimating The Deformation Modulus of Rock Mass With Use of Seismic Tomography [Volume 7, Issue 17, 2013, Pages 83-92]
H
Haji Amin Shirazi, H Optimizing ore sampling procedure of drill holes at Miduk porphyry copper deposit and its effects on processing plant recovery [Volume 7, Issue 14, 2012, Pages 41-49]
Hamidkhah, O An investigation of grade variability of the Esfordi phosphate plant feed using
geostatistical method [Volume 7, Issue 14, 2012, Pages 51-61]
Hassani Sadrabadi, S Evaluation of Alternative Methods for Estimation of Bond Work Index
(Case Study: Choghart Iron Ore) [Volume 7, Issue 14, 2012, Pages 63-68]
Hassanzadeh, A Optimization of mine production rate using conditional NPV maximization [Volume 7, Issue 15, 2012, Pages 87-96]
Havaej, M An Equation to predict ground surface settlement due to metro tunneling using EPB TBM [Volume 7, Issue 15, 2012, Pages 67-76]
Hayati, M Investigating the Effects of Time and Cost Uncertainties on The Feasibility Study Procedures in Mining Projects [Volume 7, Issue 16, 2012, Pages 101-114]
Hoseini, M Back Analysis of Siah Bisheh Dam Powerhouse Cavern Using
Instrumentation’s Results [Volume 7, Issue 14, 2012, Pages 83-90]
Hoseini, M Presentation of Empirical Relations for Determining Deformation Modulus in Rock Masses of Southwest of Iran [Volume 7, Issue 16, 2012, Pages 79-87]
Hoseini, S.H Development of a Fuzzy Classification for Prediction of Penetration Rate of Drilling in Mines [Volume 7, Issue 16, 2012, Pages 89-99]
Hoseinpour, M Investigating the Effects of Time and Cost Uncertainties on The Feasibility Study Procedures in Mining Projects [Volume 7, Issue 16, 2012, Pages 101-114]
J
Jalali, S.M.E Influence of Fleet Tracking on the Reliability of Ventilation System in Underground Mines
Case Study: Takht Coal Mine [Volume 7, Issue 14, 2012, Pages 1-14]
Jalali, S.M.E Optimization of Pillar Size in Faryab Chromite Mine Considering Extraction Sequences [Volume 7, Issue 15, 2012, Pages 35-47]
Jamshidi, H An optimized grout mix design for EPB TBM tunneling of Shiraz metro in dry condition [Volume 7, Issue 14, 2012, Pages 69-82]
Javanshir, S The study of operation conditions on solvent extraction of gold in continuous process using laboratory scale mixer-settler [Volume 7, Issue 15, 2012, Pages 57-66]
K
Kamkarrohani, A Two and Three Dimensional Modeling of Electrical Tomography Data Applied for Studying Qanat and Subsurface Shallow Structures [Volume 7, Issue 17, 2013, Pages 107-112]
Kargar- Dianati, M.R Optimizing ore sampling procedure of drill holes at Miduk porphyry copper deposit and its effects on processing plant recovery [Volume 7, Issue 14, 2012, Pages 41-49]
Khalesi, M.R Designing Dynamic Simulator of Grinding Circuit using SIMULINK [Volume 7, Issue 17, 2013, Pages 41-49]
Khalokakaei, R Development of a Fuzzy Classification for Prediction of Penetration Rate of Drilling in Mines [Volume 7, Issue 16, 2012, Pages 89-99]
Khayrollahi, H Application of clustering in preparation of pseudo geological maps using airborne geophysical data [Volume 7, Issue 16, 2012, Pages 1-12]
Khodadadi, A Designing Dynamic Simulator of Grinding Circuit using SIMULINK [Volume 7, Issue 17, 2013, Pages 41-49]
Khodadadi darban, A The study of operation conditions on solvent extraction of gold in continuous process using laboratory scale mixer-settler [Volume 7, Issue 15, 2012, Pages 57-66]
Kianinia, Y Designing Dynamic Simulator of Grinding Circuit using SIMULINK [Volume 7, Issue 17, 2013, Pages 41-49]
Koleini, S.M.J Determination of optimal conditions in column flotation of Masoud Abad Lorestan
Talc Mine [Volume 7, Issue 14, 2012, Pages 91-97]
Koleini, S.M.J kinetics of Chemical leaching of Darehzar low grade copper ore [Volume 7, Issue 17, 2013, Pages 51-60]
M
Madani, H The study of effective factors on Hardy Cross method convergence in mine ventilation networks analysis [Volume 7, Issue 17, 2013, Pages 15-21]
Madani, S.H Numerical Investigating Of Methane Gas Concentration In Mine Face Case study: Mike Mine [Volume 7, Issue 15, 2012, Pages 49-55]
Maleki Tehrani, M.A Simulation of mineral grades and decrease of conditional variance of simulation using hard and soft conditioning data, based on Local moment constraints method. [Volume 7, Issue 16, 2012, Pages 13-23]
Manafi, Z kinetics of Chemical leaching of Darehzar low grade copper ore [Volume 7, Issue 17, 2013, Pages 51-60]
Mansouri, H An optimized grout mix design for EPB TBM tunneling of Shiraz metro in dry condition [Volume 7, Issue 14, 2012, Pages 69-82]
Mansouri, H Replacement of Dynamite with ANFO in Tunneling [Volume 7, Issue 17, 2013, Pages 1-14]
Masoomi, H An optimized grout mix design for EPB TBM tunneling of Shiraz metro in dry condition [Volume 7, Issue 14, 2012, Pages 69-82]
Mehrishal, S.A Modeling of the Rock Joints Mechanical Behavior Considering Surface Roughness during the Direct Shear Test [Volume 7, Issue 16, 2012, Pages 69-78]
Memarian, H Study of the Sources and Mechanisms of Produced H2S in Nosoud Tunnel (West of Kermanshah) [Volume 7, Issue 15, 2012, Pages 1-14]
Mikaeil, R Presentation of Statistical Models for Predicting the Ornamental Stone
Sawability [Volume 7, Issue 14, 2012, Pages 31-40]
Mikaeil, R Development of a Fuzzy Classification for Prediction of Penetration Rate of Drilling in Mines [Volume 7, Issue 16, 2012, Pages 89-99]
Mirzaei, Z Discharge Grate Effect on Simulation of Ball Mills [Volume 7, Issue 16, 2012, Pages 33-41]
Mirzaeian, U Modeling of the Rock Joints Mechanical Behavior Considering Surface Roughness during the Direct Shear Test [Volume 7, Issue 16, 2012, Pages 69-78]
Mohammadi Moskouei, M Topographic correction of hyperspectral data of west east-Azarbayjan [Volume 7, Issue 15, 2012, Pages 25-33]
Monjezi, M Determination of Optimized Excavation Pattern and Execution of Tunnel Support in the Weak Rocks (A Case Study) [Volume 7, Issue 15, 2012, Pages 97-102]
Moore, F Investigation of Heavy metals Enrichment in Stream Sediments of Sungun Porphyry Copper Deposit [Volume 7, Issue 17, 2013, Pages 33-39]
Mostofi, N kinetics of Chemical leaching of Darehzar low grade copper ore [Volume 7, Issue 17, 2013, Pages 51-60]
N
Naderi, H kinetics of Chemical leaching of Darehzar low grade copper ore [Volume 7, Issue 17, 2013, Pages 51-60]
Nikkhah, M A New Method for Determination of Kaiser Effect from Rock Acoustic Emission Signals [Volume 7, Issue 17, 2013, Pages 61-72]
Niknam, B Numerical Investigating Of Methane Gas Concentration In Mine Face Case study: Mike Mine [Volume 7, Issue 15, 2012, Pages 49-55]
Njafi, M Optimization of Pillar Size in Faryab Chromite Mine Considering Extraction Sequences [Volume 7, Issue 15, 2012, Pages 35-47]
P
Parandeh, L Evaluation of Alternative Methods for Estimation of Bond Work Index
(Case Study: Choghart Iron Ore) [Volume 7, Issue 14, 2012, Pages 63-68]
R
Rahimipour, Gh.R Optimizing ore sampling procedure of drill holes at Miduk porphyry copper deposit and its effects on processing plant recovery [Volume 7, Issue 14, 2012, Pages 41-49]
Rahmannejad, R An Equation to predict ground surface settlement due to metro tunneling using EPB TBM [Volume 7, Issue 15, 2012, Pages 67-76]
Rezaee, S Study of the Sources and Mechanisms of Produced H2S in Nosoud Tunnel (West of Kermanshah) [Volume 7, Issue 15, 2012, Pages 1-14]
Rezaei, A Optimizing ore sampling procedure of drill holes at Miduk porphyry copper deposit and its effects on processing plant recovery [Volume 7, Issue 14, 2012, Pages 41-49]
Rezaei, Z Influence of Fleet Tracking on the Reliability of Ventilation System in Underground Mines
Case Study: Takht Coal Mine [Volume 7, Issue 14, 2012, Pages 1-14]
S
Sahabi, F Study of the Sources and Mechanisms of Produced H2S in Nosoud Tunnel (West of Kermanshah) [Volume 7, Issue 15, 2012, Pages 1-14]
Salarirad, H Numerical Investigating Of Methane Gas Concentration In Mine Face Case study: Mike Mine [Volume 7, Issue 15, 2012, Pages 49-55]
Sayadi, A.R Valuation of Mining Development Projects by Real Options Approach [Volume 7, Issue 14, 2012, Pages 15-30]
Sayadi, A.R Optimization of mine production rate using conditional NPV maximization [Volume 7, Issue 15, 2012, Pages 87-96]
Sayadi, A.R Optimization of mine production rate using conditional NPV maximization [Volume 7, Issue 15, 2012, Pages 87-96]
Sayadi, A.R Investigating the Effects of Time and Cost Uncertainties on The Feasibility Study Procedures in Mining Projects [Volume 7, Issue 16, 2012, Pages 101-114]
Serati, M TBM Shield Selection Squeezing Ground, Case Study Part 2 Qomroud Tunel [Volume 7, Issue 17, 2013, Pages 93-106]
Sereshki, F Influence of Fleet Tracking on the Reliability of Ventilation System in Underground Mines
Case Study: Takht Coal Mine [Volume 7, Issue 14, 2012, Pages 1-14]
Shadman, M Application of clustering in preparation of pseudo geological maps using airborne geophysical data [Volume 7, Issue 16, 2012, Pages 1-12]
Shafaei, S.Z Chalcopyrite removal from copper-molybdenite concentrate
using electrochemical flotation and external potential [Volume 7, Issue 16, 2012, Pages 53-67]
Shahsavani, D Application of the MARS modeling to estimate the gold values based on the paragenetic elements for an exploration data set [Volume 7, Issue 15, 2012, Pages 15-23]
Shariat alavi, H TBM Shield Selection Squeezing Ground, Case Study Part 2 Qomroud Tunel [Volume 7, Issue 17, 2013, Pages 93-106]
Sharifzadeh, M Modeling of the Rock Joints Mechanical Behavior Considering Surface Roughness during the Direct Shear Test [Volume 7, Issue 16, 2012, Pages 69-78]
Shojasadati, S.A kinetics of Chemical leaching of Darehzar low grade copper ore [Volume 7, Issue 17, 2013, Pages 51-60]
T
Tabasi, S Determination of Residual Component of Gravitimetry Data Using Probability Plot Modeling Method [Volume 7, Issue 17, 2013, Pages 23-32]
Tahmasebi, M.A Determination of Optimized Excavation Pattern and Execution of Tunnel Support in the Weak Rocks (A Case Study) [Volume 7, Issue 15, 2012, Pages 97-102]
Tokhmchi, B Application of clustering in preparation of pseudo geological maps using airborne geophysical data [Volume 7, Issue 16, 2012, Pages 1-12]
Torab, F.M An investigation of grade variability of the Esfordi phosphate plant feed using
geostatistical method [Volume 7, Issue 14, 2012, Pages 51-61]
Torabi, S.R Determination of Optimized Excavation Pattern and Execution of Tunnel Support in the Weak Rocks (A Case Study) [Volume 7, Issue 15, 2012, Pages 97-102]
V
Valian, A.R Discharge Grate Effect on Simulation of Ball Mills [Volume 7, Issue 16, 2012, Pages 33-41]
Veshadi, M.A Measuring Permeability Coefficient of a Granular Soil against Acidic Solutions in Heap Leaching Structures [Volume 7, Issue 16, 2012, Pages 43-52]
Y
Yarahmadi, M.R Chalcopyrite removal from copper-molybdenite concentrate
using electrochemical flotation and external potential [Volume 7, Issue 16, 2012, Pages 53-67]
Yousefi, R Presentation of Statistical Models for Predicting the Ornamental Stone
Sawability [Volume 7, Issue 14, 2012, Pages 31-40]
Z
Zakeri, M Design and Installation of a Particle Size Analyzer for Mineral Processing Plants [Volume 7, Issue 14, 2012, Pages 99-105]
Zamani, A Measuring Permeability Coefficient of a Granular Soil against Acidic Solutions in Heap Leaching Structures [Volume 7, Issue 16, 2012, Pages 43-52]
Zare, H.R Chalcopyrite removal from copper-molybdenite concentrate
using electrochemical flotation and external potential [Volume 7, Issue 16, 2012, Pages 53-67]
Zare, Sh Selection of Suitable Mechanized Machine for Tehran Metro Line7 Project (East – West Tunnel) [Volume 7, Issue 15, 2012, Pages 77-86]
Zarei, V Estimating The Deformation Modulus of Rock Mass With Use of Seismic Tomography [Volume 7, Issue 17, 2013, Pages 83-92]
Zeidabadi, S Chalcopyrite removal from copper-molybdenite concentrate
using electrochemical flotation and external potential [Volume 7, Issue 16, 2012, Pages 53-67]
Zoorabadi, M Estimating The Deformation Modulus of Rock Mass With Use of Seismic Tomography [Volume 7, Issue 17, 2013, Pages 83-92]
Zoorabadi, M TBM Shield Selection Squeezing Ground, Case Study Part 2 Qomroud Tunel [Volume 7, Issue 17, 2013, Pages 93-106]