Nikbin, V., Ataee-Pour, M., Anani, A., “Optimization of level intervals in steeply-dipping vein deposits: A two-step approach”, Resources Policy, No. 69, pp. 1 – 12, 2020. ##
Riddle, J. M., “A dynamic programming solution of a block-caving mine layout”, The 14th APCOM Symposium, Society of Mining Engineers-American Institute of Mining, Metallurgy and Petroleum Engineers, New York, 767 - 772, 1977. ##
Nikbin, V., Ataee-Pour, M., Shahriar, K., Pourrahimian, Y., “A Greedy Algorithm for Stope Boundaries Optimization”, 8th Annual Report Mining Optimization Laboratory (MOL), pp. 246-252, 2017. ##
Ovanic, J., Young, D. S., “Optimisation of stope geometry using separable programming with special branch and bound techniques”, Third Canadian Conference on Computer Applications in the Mineral Industry, McGill University, Montreal 129 - 135, 1995. ##
Alford, C., “Optimisation in underground mine design”, International Journal of Rock Mechanics and Mining Sciences and Geomechanics, No. 5, 1996. ##
Ataee-Pour, M., “A heuristic algorithm to optimise stope boundaries”, doctor of philosophy, university of Wollongong, New South Wales, 2000. ##
Jalali, S.E., Ataee-pour, M.; “A 2D Dynamic Programming Algorithm to Optimize Stope Boundaries”, in 2004 Proceedings of the 13th symposium on Mine Planning and Equipment Selection, (eds. M. Hardygora et al.), Rotterdam, Balkema, p. p. 45- 52, 2004. ##
عطاییپور، مجید.؛ جلالی، سید محمد اسماعیل.؛ " انتخاب بهینه محدوده معدن و جانمایی کارگاههای استخراج در معادن زیرزمینی"، نشریه علمی- پژوهشی مهندسی معدن، شماره 20، دوره 8، ص73-89، 1392. ##
جلالی، سیدمحمد اسماعیل.؛ حسینی، هادی.؛ "بهینهسازی محدوده استخراج در معادن زیرزمینی با استفاده از الگوریتم حریصانه"، نشریه علمی- پژوهشی مهندسی معدن، شماره 7، دوره 4، ص1-11، 1388. ##
Topal, E., Sens, J., “A new algorithm for stope boundary optimization”, Journal of Coal Science and Engineering (China), No. 16 (2), pp. 113 – 119, 2010. ##
Bai, X., Marcotte, D., Simon, R., “Underground stope optimization with network flow method”, Computers & Geosciences, No. 52, pp. 361 – 371, 2013. ##
Bai, X., Marcotte, D., Simon, R., “A heuristic sublevel stope optimizer with multiple raises”, Journal of the Southern African Institute of Mining and Metallurgy, No. 114 (6), pp. 427 – 434, 2014. ##
Nelis, G., Gamache, M., Marcotte, D., Bai, X., “Stope optimization with vertical convexity constraints”, Optimization and Engineering, No. 17 (4), pp. 813 – 832, 2016. ##
Sandanayake, D. S. S., Topal, E., Asad, M. W. A., “Designing an optimal stope layout for underground mining based on a heuristic algorithm”, International Journal of Mining Science and Technology, No. 25 (5), pp. 767 – 772, 2015. ##
Hou, J., Xu, C., Dowd, P., Li, G., “Integrated optimisation of stope boundary and access layout for underground mining operations”, Mining Technology, No. 128 (4), pp. 193 – 205, 2019. ##
Asli Sari, Y., Kumral, M., “Sublevel stope layout planning through a greedy heuristic approach based on dynamic programming”, Journal of the Operational Research Society, pp. 1 – 10, 2020. ##
Foroughi, S., Hamidi, J.K., Monjezi, M., Nehring, M., “The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II)”, Resources Policy, 63, p.101408, 2019. ##
Nikbin, V., M. Ataee-pour., “An Integer Programming Algorithm for Stope Layout Optimization”, Amirkabir Journal of Civil Engineering, No. 48 (3), pp. 329-338, 2016. ##
Nikbin, V., Mardaneh, E., M., Asad, M. W. A., Topal, E., “Pattern search method for accelerating Stope boundary optimization problem in underground mining operations”, Engineering Optimization, No. 54 (5), pp. 1-13, 2021. ##
Furtado, M., Dimitrakopoulos, R., Pinto, C., “Stochastic stope design optimisation under grade uncertainty and dynamic development costs”, International Journal of Mining, Reclamation and Environment, Vol. 36 (2), pp. 1-23, 2021. ##
Sari, Y. A., Kumral, M., “Clustering-based iterative approach to stope layout optimization for sublevel stoping”, Journal of the Southern African Institute of Mining and Metallurgy, Vol. 121 (3), pp. 97-106, 2021. ##
Sotoudeh, F., Kakaie, R., Ataei, M., “Development of a computer program for underground mine stope optimisation using a heuristic algorithm”, Proceedings of the First International Conference on Underground Mining Technology, pp. 689-700, 2017.
##
Morales, N., Mancilla, D., Miranda, R., Vallejos, J., “A fast method to develop an optimal operational sublevel stope design”, Resources Policy, No. 77, 2022. ##
Nhleko, S., Musingwini, C., “Optimisation of Three-Dimensional Stope Layouts Using a Dual Interchange Algorithm for Improved Value Creation”, Minerals, 12, 501, pp. 1-16, 2022. ##
Shami-Qalandari, M., Rahmanpour, M., Mirabedi, S.M., “Determining a resilient stope boundary for underground mass mining projects”, Rudarsko-geološko-naftni zbornik, 37(5), pp.103-116, 2022. ##
Esmaeili, A., Hamidi, J.K., Mousavi, A., “Determination of sublevel stoping layout using a network flow algorithm and the MRMR classification system”, Resources Policy, 80, p.103265, 2023. ##
Janiszewski, M., Pontow, S., Rinne, M., “Industry Survey on the Current State of Stope Design Methods in the Underground Mining Sector”, Energies, 15, 240, pp. 2-20, 2022. ##
Mutandwa, B., Musingwini, C., “Insights and future research directions from a bibliometric mapping of studies in stope layout optimization”, International Journal of Mining, Reclamation and Environment, pp.1-19, 2024. ##
Habib, K.M., Shnorhokian, S., Mitri, H., “Evaluating the application of rock breakage without explosives in underground construction—a critical review of chemical demolition agents”, Minerals, 12(2), p.220, 2022. ##
Ataee-pour, M., “The MVN multiple pass algorithm for optimization of stope boundaries”, Iranian Journal of Mining Engineering (IRJME), 1(2):88-73, 2006. ##