Optimization of Rock Fragmentation based on Mine-to-Mill Approach at Gole Gohar Iron Ore Mine No.1

Document Type : research - paper

Authors

Shahid Bahonar University of Kerman

Main Subjects


مراجع
1. Kanchibotla, S. S., 2003. Optimum Blasting? Is it Minimum Cost per Broken Rock or Maximum Value per Broken Rock?, in Proceedings 7th International Symposium on Rock Fragmentation by Blasting, pp. 35-48.
2. Kanchibotla, S. S., Valery, W., Morrell, S., 1999. Modeling Fines in Blast Fragmentation and its Impact on Crushing and Grinding, Proceedings the Explo-99 Conference, Kalgoorlie, Australia, pp. 137–144.
3. Kanchibotla, S. S., Grundstrom, C., Jankovic, A., Thornton, D. M., 2001. Blast Fragmentation for Maximizing the SAG Mill Throughput at Porgera Goldmine, Proceedings the 27th Annual Conference on Explosives and Blasting Technique, Orlando, Florida, pp. 383-399.
4. VanDelinder, P., Eloranta, J., Orobona, M., 2004. Blasting for Improved Autogenous Milling at Hibbing Taconite Company, Improving and Optimizing Operations. Things that Actually Work! Plant Opera or’s Forum, ocie y For Mi i g, Me allurgy & Exploration, pp. 32-48.
5. Burger, B., McCaffery, K., Jankovic, A., Valery, W., McGaffin, I., 2006. Batu Hijau Model for
Throughput Forecast. Mining and Milling Optimisation and Expansion Studies, Proceedings 3rd International Symposium of Society for Mining, Metallurgy and Exploration, St. Louis, Missouri, pp. 461-480.
6. Dance, A., Valery, W., Jankovic, A., La Rosa, D., Colacioppo, J., 2007. Process Integration and Optimisation– a Case Study in Productivity Improvement, Proceedings 6th Large Open Pit Mining Conference, Perth, Western Australia, pp 47-54.
7. Dance, A., Mwansa, S., Valery, W., Amonoo, G., Bisiaux, B., 2011. Improvement in SAG Mill Throughput from Finer Feed Size at the Newmont Ahafo Operation. Proceedings the 5th SAG Conference, Vancouver, Canada, pp. 57-64.
8. Hart, S., Rees, T., Tavani, S., Valery, W., Jankovic, A., 2011. Process Integration and Optimisation of the Boddington HPGR Circuit, Proceedings the 5th SAG Conference, Vancouver, Canada, pp. 124-131.
9. Kanchibotla, S., 2014. Mine to Mill Value Chain Optimization: Role of Blasting, Mineral Processing and Extractive Metallurgy: 100 Years of Innovation, Society for Mining, Metallurgy & Exploration, Englewood, CO, United States, pp. 51-64
10 [. شرکت مهندسین مشاور کوشا معدن، 1313 . گزارش آشنایی [
با معدن سنگ آهن گل گهر.
11. Dobby, G., Bennett, C., Kosick, G., 2001. Advances in SAG Circuit Design and Simulation Applied to the Mine Block Model, 4th International Autogenous and Semi-Autogenous Grinding Technology, pp. 221-234.
12. Kosick, G. A., Bennett, C., 1999. The Value of Ore Boady Power Requirement Profiles for SAG Circuit Design, Proceedings 31th Mineral Conference, Ottawa, Canada.
13. Amelunxen, P., Berrios, P., Rodriguez, E., 2014. The SAG Grindability Index Test, Minerals Engineering 55, pp. 42-51.
14. Hekmat, A., Osanloo, M., 2005. Prediction of Shovel Productivity in the Gole-Gohar Iron Mine, Journal of Mining Science, Vol 41, pp. 177-184.
بهینه سازی خردایش ناشی از انفجار با رویکرد معدن-کارخانه نشریه علمی- پژوهشی مهندسی معدن
54
15. Napier, T. J., Morrell, S., Morrison, R. D., Kojovic, T., 1996. Mineral Comminution Circuits: Their Operation and Optimisation, JKMRC Monograph Series in Mining and Mineral Processing 2, pp. 49-92.