منابع Baafi, E. and W. Zeng. A Discrete-Event Simulation for a Truck-Shovel System. in Proceedings of the 27th International Symposium on Mine Planning and Equipment Selection-MPES 2018. 2019. Springer.## Sturgul, J., Discrete simulation and animation for mining engineers. 2015: CRC Press.## Torkamani, E., Linkage of Truck-and-shovel Operations to Short-term Mine Plans Using Discrete Event Simulation. 2013.## Alarie, S. and M. Gamache, Overview of solution strategies used in truck dispatching systems for open pit mines. International Journal of Surface Mining, Reclamation and Environment, 2002. 16(1): p. 59-76.## آزادی, ن, عطائی پور،م و م. منجزی،م ", بهبود اندازه ناوگان حمل و نقل معدن مس سونگون با استفاده از روش شبیهسازی". مدل سازی در مهندسی, 1393. 12(39) ص 99-110.## Salama, A., J. Greberg, and H. Schunnesson, The use of discrete event simulation for underground haulage mining equipment selection. International Journal of Mining and Mineral Engineering, 2014. 5(3): p. 256-271.## Skawina, B., et al., The effects of orepass loss on loading, hauling, and dumping operations and production rates in a sublevel caving mine. Journal of the Southern African Institute of Mining and Metallurgy, 2018. 118(4): p. 409-418.## Dumakor, N., V. Temeng, and K. Bansah, Optimising Shovel-Truck Fuel Consumption using Stochastic Simulation. Ghana Mining Journal, 2017. 17(2): p. 39-49.## Ataeepour, N. and E. Baafi, ARENA simulation model for truck-shovel operation in despatching and non-despatching modes. International Journal of Surface Mining, Reclamation and Environment, 1999. 13(3): p. 125-129.## Kaba, F., V. Temeng, and P. Eshun. Prediction of mining production using Arena simulation. in 3rd UMa T Biennial international mining and mineral conference. 2014.## Hashemi, A.S. and J. Sattarvand. Application of ARENA simulation software for evaluation of open pit mining transportation systems–a case study. in Proceedings of the 12th International Symposium Continuous Surface Mining-Aachen 2014. 2015. Springer.## Que, S., K. Awuah-Offei, and S. Frimpong, Optimising design parameters of continuous mining transport systems using discrete event simulation. International Journal of Mining, Reclamation and Environment, 2016. 30(3): p. 217-230.## Frough, O., A. Khetwal, and J. Rostami, Predicting TBM utilization factor using discrete event simulation models. Tunnelling and Underground Space Technology, 2019. 87: p. 91-99.## علمداری، ص.، م.ح. بصیری، و م. عطایی پور, تجزیه و تحلیل عملیات استخراج معدن خاک نسوز آباده به کمک شبیه سازی سیستم ترابری. نشریه مهندسی منابع معدنی، 1398. (4) 3. ص 37-50.## Choi, B.K. and D. Kang, Modeling and simulation of discrete event systems. 2013: John Wiley & Sons.## Sturgul, J., Discrete mine system simulation in the United States. International Journal of Surface Mining, Reclamation and Environment, 1999. 13(2): p. 37-41.## Wainer, G.A. and P.J. Mosterman, Discrete-event modeling and simulation: theory and applications. 2016: CRC press.## Altiok, T. and B. Melamed, Simulation and Analysis with Arena. 2007, Burlington, MA: Academic Press.## Kelton, W.D., Simulation with ARENA. 2002: McGraw-hill.## Sadowski, R.P., W.D. Kelton, and R.P. Sadowski, Simulation with ARENA. 1998: McGraw-Hill.##