مراجع
1. Kanchibotla, S. S., 2003. Optimum Blasting? Is it Minimum Cost per Broken Rock or Maximum Value per Broken Rock?, in Proceedings 7th International Symposium on Rock Fragmentation by Blasting, pp. 35-48.
2. Kanchibotla, S. S., Valery, W., Morrell, S., 1999. Modeling Fines in Blast Fragmentation and its Impact on Crushing and Grinding, Proceedings the Explo-99 Conference, Kalgoorlie, Australia, pp. 137–144.
3. Kanchibotla, S. S., Grundstrom, C., Jankovic, A., Thornton, D. M., 2001. Blast Fragmentation for Maximizing the SAG Mill Throughput at Porgera Goldmine, Proceedings the 27th Annual Conference on Explosives and Blasting Technique, Orlando, Florida, pp. 383-399.
4. VanDelinder, P., Eloranta, J., Orobona, M., 2004. Blasting for Improved Autogenous Milling at Hibbing Taconite Company, Improving and Optimizing Operations. Things that Actually Work! Plant Opera or’s Forum, ocie y For Mi i g, Me allurgy & Exploration, pp. 32-48.
5. Burger, B., McCaffery, K., Jankovic, A., Valery, W., McGaffin, I., 2006. Batu Hijau Model for
Throughput Forecast. Mining and Milling Optimisation and Expansion Studies, Proceedings 3rd International Symposium of Society for Mining, Metallurgy and Exploration, St. Louis, Missouri, pp. 461-480.
6. Dance, A., Valery, W., Jankovic, A., La Rosa, D., Colacioppo, J., 2007. Process Integration and Optimisation– a Case Study in Productivity Improvement, Proceedings 6th Large Open Pit Mining Conference, Perth, Western Australia, pp 47-54.
7. Dance, A., Mwansa, S., Valery, W., Amonoo, G., Bisiaux, B., 2011. Improvement in SAG Mill Throughput from Finer Feed Size at the Newmont Ahafo Operation. Proceedings the 5th SAG Conference, Vancouver, Canada, pp. 57-64.
8. Hart, S., Rees, T., Tavani, S., Valery, W., Jankovic, A., 2011. Process Integration and Optimisation of the Boddington HPGR Circuit, Proceedings the 5th SAG Conference, Vancouver, Canada, pp. 124-131.
9. Kanchibotla, S., 2014. Mine to Mill Value Chain Optimization: Role of Blasting, Mineral Processing and Extractive Metallurgy: 100 Years of Innovation, Society for Mining, Metallurgy & Exploration, Englewood, CO, United States, pp. 51-64
10 [. شرکت مهندسین مشاور کوشا معدن، 1313 . گزارش آشنایی [
با معدن سنگ آهن گل گهر.
11. Dobby, G., Bennett, C., Kosick, G., 2001. Advances in SAG Circuit Design and Simulation Applied to the Mine Block Model, 4th International Autogenous and Semi-Autogenous Grinding Technology, pp. 221-234.
12. Kosick, G. A., Bennett, C., 1999. The Value of Ore Boady Power Requirement Profiles for SAG Circuit Design, Proceedings 31th Mineral Conference, Ottawa, Canada.
13. Amelunxen, P., Berrios, P., Rodriguez, E., 2014. The SAG Grindability Index Test, Minerals Engineering 55, pp. 42-51.
14. Hekmat, A., Osanloo, M., 2005. Prediction of Shovel Productivity in the Gole-Gohar Iron Mine, Journal of Mining Science, Vol 41, pp. 177-184.
بهینه سازی خردایش ناشی از انفجار با رویکرد معدن-کارخانه نشریه علمی- پژوهشی مهندسی معدن
54
15. Napier, T. J., Morrell, S., Morrison, R. D., Kojovic, T., 1996. Mineral Comminution Circuits: Their Operation and Optimisation, JKMRC Monograph Series in Mining and Mineral Processing 2, pp. 49-92.