Kim, Y.-G., Guidelines for Improved Risk Management on Tunnel and Underground Construction Projects in USA.## Magazine of korean Tunneling and Underground Space Association, 2019. 21(2): p. 10-24.## Liu, W., et al., Safety risk factors of metro tunnel construction in China: an integrated study with EFA and SEM. Safety science, 2018. 105: p. 98-113.## Brox, D., Practical Guide to Rock Tunneling. 2017: CRC Press. ## Kosugi, T., et al., Time to realization: Evaluation of CO2 capture technology R&Ds by GERT (Graphical Evaluation and Review Technique) analyses. Energy, 2004. 29(9-10): p. 1297-1308. ## Nelson, R.G., A. Azaron, and S. Aref, The use of a GERT based method to model concurrent product development processes. European journal of operational research, 2016. 250(2): p. 566-578. ## Tao, L., et al., Schedule risk analysis for new-product development: The GERT method extended by a characteristic function. Reliability Engineering & System Safety, 2017. 167: p. 464-473. ## Zhou, L., et al., Forecasting return of used products for remanufacturing using Graphical Evaluation and Review Technique (GERT). International Journal of Production Economics, 2016. 181: p. 315-324. ## Mahmoodzadeh, A. and S. Zare, Probabilistic prediction of expected ground condition and construction time and costs in road tunnels. Journal of Rock Mechanics and Geotechnical Engineering, 2016. 8(5): p. 734-745.## Loprencipe, G., G. Cantisani, and P. Di Mascio. Global assessment method of road distresses. In Fourth International Symposium on Life-Cycle Civil Engineering IALCCE. 2014.## Xie, X., et al., A real-time interaction platform for settlement control during shield tunnelling construction. Automation in Construction, 2018. 94: p. 154-167.## Kollarou, C., Excavation materials handling in the Loetschberg Base Tunnel using Decision Aids for Tunneling (DAT). 2002, Massachusetts Institute of Technology.## Ritter, S., H. Einstein, and R. Galler, Planning the handling of tunnel excavation material–A process of decision making under uncertainty. Tunnelling and underground space technology, 2013. 33: p. 193-201.## Ioannou, P.G., The economic value of geologic exploration as a risk reduction strategy in underground construction. 1984, Massachusetts Institute of Technology.## Mahmoodzadeh, A., et al., Updating ground conditions and time-cost scatter-gram in tunnels during excavation. Automation in Construction, 2019. 105: p. 102822.## Guan, Z., et al., Probabilistic estimation of ground condition and construction cost for mountain tunnels. Tunnelling and underground space technology, 2014. 42: p. 175-183.## Pritsker, A.A.B., GERT: Graphical Evaluation and Review Technique, Part I. Fundamental. J. of Industrial Eng., 1996. 17(5): p. 267-274.## Pritsker, A.A.B., GERT: Graphical Evaluation and Review Technique, Part II. Probabilistic and Industrial Engineering. J. Ind. Eng., 1966(6): p. 293-301. ## Pillai, P.S., A comprehensive study of project scheduling techniques and the introduction of new techniques. 2015.## Kannan, R., Graphical Evaluation and Review Technique (GERT). 2014.## Whitehouse, G.E., Systems analysis and design using network techniques. 1973. ## Whitehouse, G.E. and A.A.B. Pritsker, GERT: part III—further statistical results; counters, renewal times, and correlations. AIIE Transactions, 1969. 1(1): p. 45-50. ## Robichaud, L.P., M. Boisvert, and J. Robert, Signal flow graphs and applications. 1962: London: Prentice-Hall International. ## Lin, K.-P., et al., Developing a Tω (the weakest t-norm) fuzzy GERT for evaluating uncertain process reliability in semiconductor manufacturing. Applied soft computing, 2011. 11(8): p. 5165-5180##. Li, M., H. Yu, and P. Liu, An automated safety risk recognition mechanism for underground construction at the pre-construction stage based on BIM. Automation in Construction, 2018. 91: p. 284-292. ## Eskesen, S., P. Tengborg, and J. Kampmann, TH and Veicherts, “. Guidelines for Tunneling Risk Management. Tunneling and Underground Space Technology, 2004. 19: p. 217-237. ## Wagner, H. and M. Knights. Risk management of tunneling works. In Workshop on safety in Tunnels and Underground Structures, Riyadh. 2006. ## Parker, H.W. and J. Reilly. Life cycle cost considerations using risk management techniques. In World tunneling conference, Budapest. 2009. ## Mhetre, K., et al., Risk Management of Construction Projects by using Primavera Risk Analysis. 2019. ##